May 2018
Type | Description | Announcement # | Issuance Date | Due Date & Time |
RFT |
Avatiu Valley Power Station: Switchroom 1 HV Switchgear Replacement Project
Download-RFT-TAU-CK171831 463KB Tender Specifications: Download-Tender-Specifications 1,652KB Additional Tender Documents: |
TAU-RFT-CK171831 |
17 May 2018 |
8 June 2018 3pm Cook Islands time |
IFB | SCADA and Network Infrastructure Upgrade
Download-IFB-GPA-058-18 2,647KB Tender Amendment No.1: Download-Tender-Amendment No.1 206KB Tender Amendment No. 2: Download-Tender-Amendment No.2 182KB Tender Amendment No.3 Download-Tender-Amendment No.3 854KB Tender Amendment No.4 Download-Tender-Amendment No.4 637KB Tender Amendment No. 5 |
GPA-058-18 | 04 Apr 2018
13 Apr 2018
4 May 2018
10 May 2018
16 May 2018
24 May 2018 |
30 May 2018
2pm Guam time |
RFT |
Supply of PDD Materials and Hardware. |
PUC18-011 |
24 May 2018 |
22 June 2018
4pm Palau Time |
RFT |
Supply of 2 x Radiator Unit for Cummins QSK23 at EFL’s Levuka Power Station (G1 & G4)
Download-EFL-MR-206-2018 213KB Tender Specifications: |
EFL-MR206/2018 |
23 May 2018 |
13 June 2018 4pm Fiji Time |
RFT |
Supply of Critical Spares for Cummins QSK23 for EFL’s Levuka Power Station (G1 & G4).
Download-EFL-MR-207-2018 213KB Tender Specifications: |
EFL-MR207/2018 |
23 May 2018 |
13 June 2018 4pm Fiji Time |
RFT |
Supply of Top Overhaul Parts for Cummins QSK60 – G4 at EFL’s Sigatoka Power Station.
Download-EFL-MR-208-2018 215KB Additional Tender Documents: |
EFL-MR208/2018 |
23 May 2018 |
13 June 2018 4pm Fiji Time |
RFT |
Manufacture, Supply, Delivery and Installation of a 10MVAR/22KV Capacitors Under the Dobel Substation Capacitor Bank Project.
Download-PPL-RFT-12-2018 494KB Tender Specifications: |
PNG12/2018 |
23 May 2018 |
1 June 2018 4pm POM Time |
RFQ |
Supply of Hardwood Poles 9M |
SAMEPC-22/2018 |
23 May 2018 |
28 May 2018
10am Samoa Time |
IFB |
Provision of EPC Heavy Duty Machines. |
SAMEPC-12/2018 |
22 May 2018 |
4 June 2018
10am Apia, Time |
IFB |
For PITI CT#7 Borescope Inspection |
GPA-075-18 |
22 May 2018 |
7 June 2018
2pm Guam Time |
RFT
|
Supply of Top Overhaul Part for Cummins QSK60-G1 at EFL’s Deuba Power Station.
Download-EFL-MR-205-2018 213KB Tender Specifications |
EFL-MR205/2018 |
21 May 2018 |
13 June 2018 4pm Fiji Time |
RFT |
Supply of 1 x 1.6MW Prime Diesel Generating Set
Download-EFL-MR-204-2018 208KB Tender Specifications: |
EFL-MR204/2018 |
21 May 2018 |
20 June 2018 4pm Fiji Time |
RFT |
Assembly and Installation of a Wartsila W20V32, 10MW Oil cube at EFL’s Vuda Power Station
Download-EFL-MR-203-2018 217KB Tender Specifications: |
EFL-MR203/2018 |
21 May 2018 |
20 June 2018 4pm Fiji Time |
RFT |
Preferred Supplier for Supply of Dropout Fuse Disconnector Units and Fuse Links
Download-EFL-MR-199-2018 210KB Tender Specifications: Click here for tender specifications |
EFL-MR199/2018 |
21 May 2018 |
6 June 2018
4pm Fiji Time |
RFT |
Construction of Distribution Power Lines – Supply to Nakalou Village, Dreketi – Scheme# LAB01/17.
Download-EFL-MR-198-2018 216KB Tender Specifications: Click here for tender specifications. |
EFL-MR198/2018 |
21 May 2018 |
30 May 2018
4pm Fiji Time |
RFT |
Design and Construct, Civil Works for New Vuda 10MW Generator Transformer Pad, Firewall and Oil Separator Pit.
Download-EFL-MR-200-2018 217KB Tender Specifications: |
EFL-MR200/2018 |
21 May 2018 |
6 June 2018 4pm Fiji Time |
RFT |
Vegetation Management for 132kV Transmission Lines
Tender Specifications: |
EFL-MR209/2018 |
21 May 2018 |
6 June 2018
4pm Fiji Time |
IFB |
D20MX and SG CONFIG 10.0 Training. |
GPA-079-18 |
21 May 2018 |
31 May 2018
2:30pm Guam Time |
IFB |
Emergency Underground Reconstruction Repairs
Pre-Bid Conference/Site Visit (Non-Mandatory): 9:30 A.M.,Thursday, May 10, 2018 Cut-Off Date for Receipt of Questions: 5:00 P.M., Tuesday, May 15, Download-IFB-GPA-071-18 689KB Tender Amendment No.1 Download-Tender-Amendment-No.1 657KB Tender Amendment No. 2 |
GPA-071-18 |
4 May 2018
21 May 2018
21 May 2018 |
7 June 2018 2pm Guam Time
|
RFT |
Nuku’alofa Network Upgrade Project Supply of High Voltage Conductors and Hardware.
To obtain a copy of the RFT, please contact:
Mr. Timote Tu’ipulotu Projects Manager Tonga Power Ltd |
TPL |
15 May 2018 |
15 June 2018 |
IFB |
Vegetation Management Control |
GPA-057-18 |
18 May 2018 |
5 June 2018
2:00pm Guam Time |
IFMSB | Property Insurance |
GPA-077-18 |
18 May 2018 |
25 July
2:30pm Guam Time |
IFMSB |
Casualty Insurance |
GPA-078-18 |
18 May 2018 |
08 August 2018
2:30pm Guam Time |
IFB |
Relay Test Equipment
Tender Amendment No.1: Download-Tender-Amendment No.1 190KB Tender Amendment No.2 |
GPA-072-18 |
4 May 2018
14 May 2018
18 May 2018 |
22 May 2018 2:30pm Guam Time |
IFMSB |
Hazardous Materials Removal and Disposal for Tanquisson Power Plant and Dededo Diesel Power Plant.
(Cut-off date for Receipt of questions 18 May 2018 5pm; Chamorro Time) Download-IFMSB-GPA-068-18 33128KB Tender Amendment No.1 |
GPA-068-18
|
4 May 2018
18 May 2018 |
01 June 2018
4pm Chamorro Time
|
IFB |
20 Ton Ductable Cooling Units
Tender Amendment No.1 Download-Tender Amendment No.1 350KB Tender Amendment No. 2 |
GPA-053-18 |
20 Apr 2018
4 May 2018
16 May 2018 |
17 May 2018
2pm Guam Time |
IFMS | Supply of Diesel Fuel Oil No.2
Pre-Bid Conference (Non-Mandatory): 10am November 30, 2017 Site Visit (Non Mandatory): 1.30pm November 30, 2017 Cut-Off Date for Receipt of Questions: 5pm December 07, 2017 Download-IFMSB-GPA-008-18 1,821KB Tender Specifications: Download-Tender-Specifications 58KB Tender Amendment No. 1 Download-Tender-Amendment-No.1 2MB Tender Amendment No.2: Download-Tender-Amendment No.2 479KB Tender Amendment No.3: Download-Tender-Amendment No.3 1,662KB Tender Amendment No.4: Download-Tender-Amendment No.4 584KB Tender Amendment No.5: Download-Tender-Amendment No.5 384KB Tender Amendment No.6: Download-Tender-Amendment No.6 5,326KB Tender Amendment No.7 Download-Tender-Amendment No.7 5084KB Download-Bid-Price-Proposal 192KB |
GPA-008-18 | 20 Nov 2017
05 Jan 2018
22 Jan 2018
21 Feb 2018
22 Mar 2018
14 May 2018
16 May 2018 |
07 June 2018
2pm Guam Time (Phase I – Closing of Technical Proposal) |
RFT |
Vuda Power Station Electrical Grid Extension Project – Design Supply and Installation of Outdoor Structures and 36kV Electrical Accessories, and installation of EFL issued 33kV motorized Disconnectors
Download-RFT-EFL-MR194/2018 218KB Tender Specifications: |
EFL-MR194/2018 |
14 May 2018 |
30 May 2018 4pm Fiji Time |
RFT |
Construction of Distribution Power Lines – Supply to Vunisea Village, Dreketi Scheme: LAB02-17
Download-RFT-EFL-MR184/2018 217KB Tender Specifications: |
EFL-MR184/2018 |
14 May 2018 |
23 May 2018 4pm Fiji Time |
RFT |
Construction of Distribution Power Lines – Supply to Kawakawa Moli, Savusavu Scheme: SA02-16
Download-RFT-EFL-MR183/2018 217KB Tender Specifications: |
EFL-MR183/2018 |
14 May 2018 |
23 May 2018 4pm Fiji Time |
RFT |
Construction of Distribution Power Lines – Supply to Jitendra Dutt & Others of Korolailai, Labasa Scheme LAB21-15
Download-RFT-EFL-MR182/2018 218KB Tender Specifications: |
EFL-MR182/2018 |
14 May 2018 |
23 May 2018 4pm Fiji Time
|
RFT |
Construction of Distribution Power Lines – Supply to Rohit Chand in Qereqere Settlement, Muaniweni, Naitasiri Scheme: NU03-16
Download-RFT-EFL-MR181/2018 364KB Tender Specifications: |
EFL-MR181/2018 |
14 May 2018 |
23 May 2018 4pm Fiji time |
RFT |
Construction of Distribution Power Lines – Supply to Water Pump at Toda Catchment Site in Lomaivuna, Naitasiri Scheme:G32-17
Download-RFT-EFL-MR180/2018 364KB Tender Specifications: Download-Tender-Specifications 535KB |
EFL-MR180/2018 |
14 May 2018 |
23 May 2018 4pm Fiji time |
RFT |
Construction of Distribution Power Lines for the Rural Electrification Projects – Western Division (4 Schemes)
Download-RFT-EFL-MR179/2018 368KB Tender Specifications: click here for tender specification |
EFL-MR179/2018 |
14 May 2018 |
23 May 2018 4pm Fiji time |
RFT |
Construction of Distribution Power Lines – Supply to Proposed Subdivision of Lot 1 at Teidamu, Ba Scheme: G65-15
Download-RFT-EFL-MR43/2018 364KB Tender Specifications: click here for tender specification |
EFL-MR43/2018 |
14 May 2018 |
23 May 2018 4pm Fiji time |
RFT |
Supply of 33kV Protection Panels for Vuda Substation Extension
Tender Specifications: click here for tender specification |
EFL-MR197/2018 |
14 May 2018 |
30 May 2018 4pm Fiji time |
RFT |
Supply of Fatigue Monitoring Devices
Download-RFT-EFL-MR195/2018 346KB Tender Specifications: |
EFL-MR195/2018 |
14 May 2018 |
23 May 2018 4pm Fiji time |
RFT |
Assessment of 132kV Transmission Tower Foundation Stability
Download-RFT-EFL-MR193/2018 353KB Tender Specifications: |
EFL-MR193/2018 |
14 May 2018 |
30 May 2018 4pm Fiji time |
RFT |
Natadola Substation 33kV Switchgear Replacement
Download-RFT-EFL-MR192/2018 351KB Tender Specifications: |
EFL-MR192/2018 |
14 May 2018 |
30 May 2018 4pm Fiji time |
RFT |
Preferred Supplier for Instrument Voltage Transformer and Circuit Breaker Fuse
Download-RFT-EFL-MR191/2018 350KB Tender Specifications: |
EFL-MR191/2018 |
14 May 2018 |
23 May 2018 4pm Fiji time |
RFT |
Supply of 33kV Surge Arrestors Complete with Surge Counter
Download-RFT-EFL-MR190/2018 351KB Tender Specifications: click here for tender specification |
EFL-MR190/2018 |
14 May 2018 |
30 May 2018 4pm Fiji time |
RFT | Supply and Install one (1) 15MVA 13kV/33kV Generating Transformer at the New Vuda Power Station
Download-RFT-EFL-MR188/2018 359KB Tender Specifications: |
EFL-MR188/2018 |
14 May 2018 |
30 May 2018 4pm Fiji time |
RFT |
Vuda Power Station Electrical Grid Extension Project – Supply of 33kV Outdoor Dead Tank Circuit Breakers for Vuda RCC Substation with Capacitor Trip/Close Assist Control
Download-RFT-EFL-MR187/2018 361KB Tender Specifications: |
EFL-MR187/2018 |
14 May 2018 |
30 May 2018 4pm Fiji time |
RFT |
Supply of Outdoor Double Break Disconnectors and Disconnectors with Earth Switches and Electrical Accessories
Download-RFT-EFL-MR185/2018 355KB Tender Specifications: click here for tender specification |
EFL-MR185/2018 |
14 May 2018 |
30 May 2018 4pm Fiji time |
EOI | Peer Review Engineer – Electrical Engineering
Download-EFL-EOI 02/2018 347KB Tender Specifications: |
EOI 02/2018 |
14 May 2018 |
23 May 2018
4pm Fiji time |
IFMSB | Renewable Energy Resource Phase III
Pre-Bid Conference/Site Visit (Non-Mandatory) TBD Cut-Off Date for Receipt of Questions 4pm Friday January 05, 2018 Download-IFMSB-GPA-007-18 16,285KB Tender Specifications: Download-Tender-Specifications 233KB Tender Amendment No.1: Download-Tender-Amendment No.1 5,340KB Additional Tender Documents: Download Price Proposal Workbook 28KB Tender Amendment No.2: Download-Tender-Amendment No.2 1,905KB Tender Amendment No.3: Download-Tender-Amendment No.3 362KB Tender Amendment No.4: Download-Tender-Amendment No.4 9,685KB Download WeatherBankPGUM_2004-PRES_solardataMSGPA Tender Amendment No.5: Download-Tender-Amendment No.5 424KB Tender Amendment No.6: Download-Tender-Amendment No.6 424KB Tender Amendment No.7: |
GPA-007-18 | 17 Nov 2017
07 Dec 2017
19 Dec 2017
22 Jan 2018
13 Feb 2018
08 Mar 2018
06 Apr 2018
14 May 2018 |
27 July 2018
4pm Guam time (Phase I – Closing of Technical Proposal) |
IFB | Removal and Relocation of Engines 8 & 4 at Power Plant No.1, Lower Base, Saipan |
CUC-IFB-18-020 |
14 May 2018 |
15 June 2018
10am Saipan time |
RFP |
In-line Meters Installation Phase III
Tender Specifications: |
ASPA18.040 |
11 May 2018 |
11 June 2018
2pm American Samoa Time |
RFQ |
T&D Bucket Trucks and Digger Derrick |
ASPA18.042 |
10 May 2018 |
30 May 2018 |
IFMSB | Supply of Residual Fuel Oil No.6
Pre-Bid Conference (Non-Mandatory): 10am December 5, 2017 Site Visit (Non Mandatory): 1.30pm December 5, 2017 Cut-Off Date for Receipt of Questions: 5pm December 12, 2017 Download-IFMSB-GPA-009-18 2,237KB Tender Specifications: Download-Tender-Specifications 58KB Tender Amendment No. 1 Download-Tender-Amendment-No.1 320 KB Tender Amendment No.2: Download-Tender-Amendment-No.2 313KB Tender Amendment No.3: Download-Tender-Amendment No.3 318KB Tender Amendment No.4: Download-Tender-Amendment No.4 314KB Tender Amendment No.5: Download-Tender-Amendment No.5 316KB Tender Amendment No.6: Download-Tender-Amendment No.6 312KB Tender Amendment No.7: Download-Tender-Amendment No.7 14,527KB Tender Amendment No.8: Download-Tender-Amendment No.8 7,339KB Tender Amendment No.9: Download-Tender-Amendment No.9 589KB Tender Amendment No.10: Download-Tender-Amendment No.10 798KB Tender Amendment No.11 Download-Tender-Amendment No.11 303KB Tender Amendment No.12 Download-Tender-Amendment-12 934KB |
GPA-009-18 |
20 Nov 2017
05 Jan 2018
12 Jan 2018
29 Jan 2018
05 Mar 2018
12 Mar 2018
02 Apr 2018
12 Apr 2018
27 Apr 2018
4 May 2018
10 May 2018 |
04 May 2018
4pm Guam time
(Phase I – Closing of Technical Proposal) |
IFB | Rehabilitation of Lalomauga Hydro Scheme.
Pre-Bid Meeting: 10am March 5th, 2018 Download-IFB-EPC-SAM-EPC-LALOM/01 526KB Tender Addendum No.1: Download-Tender-Addendum No.1 338KB Download Addendum No.1 Attachment 478KB Tender Addendum No.2: Download Addendum No.2 Pre-Bid Meeting Minutes 338KB Download Addendum No.2 pre-Bid Meeting Attendance 64KB Tender Addendum No.3: Download Tender Amendment No.3 339KB Tender Addendum No.4: Download-Tender-Addendum No.4 346KB Download Questions and Answers 152KB Tender Addendum No.5: Download-Tender-Addendum No.5 0KB Tender Addendum No.6: Download-Tender-Addendum No.6 346KB Download Attachment 1 Questions and Answers 16KB Tender Addendum No.7: Download-Tender-Addendum No.7 350KB Tender Addendum No.8: Download-Tender-Addendum No.8 353KB Tender Addendum No.9: Download-Tender Addendum No.9 401KB Tender Addendum No.10: Download-Tender-Addendum No.10 402KB Download-Tender-Addendum10-Bid Form 630KB Tender Addendum No.11 |
SAM-EPC-LALOM/01 |
20 Feb 2018
15 Mar 2018
19 Mar 2018
28 Mar 2018
20 Apr 2018
24 Apr 2018
4 May 2018
07 May 2018
08 May 2018 |
15 May 2018 10am Apia Time |
IFB | Design, Engineering, Procurement, Manufacture, Construction, Installation and Commissioning of the 70kW Afolau Biomass Gasification Plant
Download-IFB-EPC-SAM-EPC-GEF01/2018 933KB Additional Tender Documents: Download Section 6 final 1,472KB Tender Addendum No.1: Download-Tender-Addendum No.1 333KB Download Generation Mix In March 200KB Download Report SROS Assessment of Feed Stock Wood 0KB Tender Addendum No.2: Download-Tender-Addendum No.2 336KB Tender Addendum No.3: Download-Tender-Addendum No.3 0KB Tender Addendum No.4: Download-Tender-Addendum No.4 343KB Download Addendum No.4 Section 3 Changes 130KB Download Addendum No.4 Attachment 2 902KB Download Addendum No.4 Attachment 3 Topo map of Project site lot 3,961KB Download Addendum No.4 Attachment 4 List of information to be provided 200KB Tender Addendum No.5: Download-Tender-Addendum 465KB Download Attach 1 Section 4 1,248KB Download Attach Section 2 Section 6 1,988KB Tender Addendum No.6: Download-Tender-Addendum No.6 347KB Download Queries 750kW Afolau Biomass Gasification Plant 180KB Download Report SROS of Feed Stock Wood 1,206KB Tender Addendum No.8: Download-Tender-Addendum No.8 430KB Tender Addendum No.7: Download-Tender-Addendum No.7 346KB Tender Addendum No.9: Download-Tender-Addendum No.9 432KB Download Pre Bid Meeting Minutes 193KB Download Attendance Record – Pre Bid Meeting 195KB Tender Addendum No.10: Download-Tender-Addendum No.10 439KB Download Attachment 1 Section 6 final rev1 1,564KB Tender Addendum No.11: Download Tender Addendum No.11 446KB Tender Addendum No. 13: |
SAM-EPC-GEF01/2018 | 09 Mar 2018
19 Mar 2018
21 Mar 2018
26 Mar 2018
03 Apr 2018
11 Apr 2018
12 Apr 2018
23 Apr 2018
07 May 2018 |
|
RFT |
Construction of Distribution Power Lines for the Rural Electrification Projects – Western Division (4 schemes)
Tender Specifications: Click here for tender specifications |
EFL-MR172/2018 |
07 May 2018 |
16 May 2018 4pm Fiji Time |
RFT |
Construction of Distribution Power Lines for the Rural Electrification Projects – Supply to Vunidawa Road, Coqeloa, Labasa (Scheme# LAB06-11)
Download-EFL-RFT-MR173-2018 216KB Tender Specifications: Click here for tender specifications |
EFL-MR173/2018 |
07 May 2018 |
16 May 2018 4pm Fiji Time
|
RFT |
Construction of Distribution Power Lines for the Rural Electrification Projects – Supply to Vitiri Settlement, Rewa (Scheme#: NU01-12)
Download-EFL-RFT-MR174-2018 215KB Tender Specifications: Click here for tender specifications |
EFL-MR174/2018 |
07 May 2018
|
16 May 2018 4pm Fiji Time |
RFT |
Construction of Distribution Power Lines for the Rural Electrification Projects – Supply to Tokaimalo Phase II, Rakiraki, Stage 3 – Scheme# RA10/13C
Download-EFL-RFT-MR175-2018 215KB Tender Specifications: Click here for tender specifications |
EFL-MR175/2018 |
07 May 2018 |
16 May 2018 4pm Fiji Time |
RFT |
Upgrading of 6.5kV to 11 kV Grid on Gordon Street Feeder from Knolly Street Zone Substation, Suva (Scheme: SR 06-15B)
Download-EFL-RFT-MR176-2018 216KB Tender Specifications: |
EFL-MR176/2018 |
07 May 2018 |
16 May 2018 4pm Fiji Time |
RFT |
Upgrading of 6.5kV to 11 kV Grid on Home of Compassion Feeder – Komo Park Substation, Suva (Scheme: SR 68-15).
Download-EFL-RFT-MR177-2018 217KB Tender Specifications: |
EFL-MR177/2018 |
07 May 2018 |
16 May 2018 4pm Fiji Time |
IFB |
Guy Compression Fitting and Line Post Insulator |
GPA-074-18 |
4 May 2018 |
22 May 2018
2:30pm Guam Time |
RFP |
Upper Faga’alu Reservoir Rehabilitation Project |
ASPA-18-041 |
3 May 2018 |
28 May 2018
2pm American Samoa Time |
IFB |
Preparation of Site for Afolau Biomass Gasification Plant
Download-IFB-EPC-02-2018 1323KB Addendum 1: Download-Tender-Addendum No.1 418KB Additional Tender Documents: Download-Tender-Pre-Bid-Meeting 277KB Download-Pre-Bid-Meeting-Attendance-Meeting 176KB
|
SAMEPC-GEF-02/2018 |
24 April 2018
02 May 2018 |
21 May 2018 10am Samoa Time |
RE-BID |
Substation Maintenance Technician Refresher Training and Recertification
Amendment No.1 |
RE-BID GPA-086-17 |
19 Apr 2018
02 May 2018 |
08 May 2018 2:30pm Guam Time |
RFP RE-SOLICITATION |
Geotechnical Investigation Services
Cut-off date for receipt of questions: 4pm, Thursday May 10, 2018 |
GPA- RFP-18-002 |
02 May 2018 |
16 May 2018 4pm Fiji Time
|
RFQ |
Supply of Ariel bundled conductor materials |
SAMEPC 19/2018 |
02 May 2018 |
21 May 2018 10am Apia, Samoa Time |
RFT |
Construction of Distribution of Power Lines – Supply to Naluwai Farm, Vunidawa – Naitasiri – Scheme # VU02/17
Download-EFL-RFT-MR-166-2018 225KB Tender Specifications: Click here for tender specifications |
EFL-MR-166/2018 |
01 May 2018 |
09 May 2018 4pm Fiji Time |